Project Bighorn

BZI was selected as a turnkey partner for the detailing, supply, fabrication, steel erection, and insulated panel scopes on this five-building hyperscale data center campus in Sparks, Nevada. The project spans over 2.5 million square feet and represents one of the largest and most complex data center builds in BZI’s history. With a fast-paced schedule and high-performance expectations, Project Bighorn leveraged BZI’s integrated Nautilus Core & Shell model to streamline delivery from detailing through installation. The result: a safer, seamless build backed by proprietary systems and proven field teams.

  • 3/25 - ONGOING
    DURATION
  • SPARKS, NV
    LOCATION
  • 2.5MM
    SQUARE FEET

Challenge

This project required rapid, high-volume steel and panel delivery under difficult weather conditions and complex crane logistics. With multiple scopes being executed sequentially across the site, structural steel and insulated panels, scope overlap and coordination could have easily created costly delays and project delivery risk. The client needed a partner who could deliver integrated solutions, reduce vendor friction, and ensure safe and efficient execution at scale.

Outcome

Through BZI’s Nautilus Core & Shell delivery model, steel and panel systems were integrated under one contract, streamlining project management and accelerating delivery. BZI’s internal detailing, fabrication, and logistics resources enabled just-in-time material delivery, avoiding downtime and mitigating risks in a congested and weather-challenged site. Proprietary innovations like the WallMaster® 300 and MezzMaster® reduced field labor, improved safety, and maintained strict quality control. Several thousand truckloads of steel have been successfully delivered and installed with high precision, setting the foundation for this complex campus.

Scopes

  • Fabrication management of structural steel components
  • Sourcing, supply, and tracking of materials
  • In-house and partner fabrication, including HSS
  • Full-service steel erection across all buildings
  • On-site safety coordination and crane planning
  • Supply and installation of exterior IMP system using BZI’s proprietary WallMaster®300 system
  • Panel fabrication and assembly utilizing PanelTable® for safe, ground-level work
  • Innovative install methods with MezzMaster® and Trackzilla® for high-reach, heavy panels
  • Offset Fastening Clip system for clean, damage-resistant panel replacements
  • Installation of louvers, vents, trim, and final envelope detailing

LET’S WORK TOGETHER

BZI accelerates project delivery and improves safety. Ready to learn how we can bring our proven approach to innovation, teamwork, and action to your next project?

Get in Touch

"Safety is the cornerstone of any successful project, and BZI's innovative top-down building approach has safety at its core. BZI's SteelTech Academy training makes sure their team members have the knowledge they need to do things correctly and safely. These are just a part of the reasons I confidently advocate for BZI to work on Ryan Companies' projects. Their expertise and dedication to safety has consistently impressed me across every project we’ve collaborated on."